LogoLogoLogoLogo
  • About Us
  • Services
    • Civil Engineering Design Services
      • Link Road and Estate Road Design (Section 38)
      • Section 278 Highway Design
      • Junction Analysis and Design
      • Adoptable Drainage Design (Section 104/106)
      • Private Drainage, External Works and Plot Setting Out
      • Site Clearance Plans
      • Construction Details
      • Existing Services Investigations
    • Flooding & Drainage
      • Flood Risk Assessments
      • Drainage Strategies
      • Existing Drainage Assessments
      • Attenuation Specification and Sizing
      • Design of Flow Control Measures
      • Sustainable Drainage Systems SuDS
      • Drainage Modelling in Micro Drainage®
    • Transport
      • School Travel Assessments
      • Junction Analysis and Design
      • Access Appraisals
      • Traffic Calming and Safety Schemes
      • Sustainable Travel Assessments
      • Traffic Counts and Radar Speed Surveys
      • Parking Surveys and Assessments
      • Green Travel Plans
      • Swept Path Analysis (Vehicle Tracking)
    • Feasibility & Planning Support
      • Technical Investigations
      • Transport Statements and Assessments
      • Flood Risk Assessments
      • Drainage Strategies
      • Existing Services Investigations
  • Sectors
    • Residential
    • Commercial
    • Education
    • Public
  • Portfolio
  • Gallery
    • Transport
    • Flooding & Drainage
    • Civil Engineering Design
  • Careers
  • Contact
  • About Us
  • Services
    • Civil Engineering Design Services
      • Link Road and Estate Road Design (Section 38)
      • Section 278 Highway Design
      • Junction Analysis and Design
      • Adoptable Drainage Design (Section 104/106)
      • Private Drainage, External Works and Plot Setting Out
      • Site Clearance Plans
      • Construction Details
      • Existing Services Investigations
    • Flooding & Drainage
      • Flood Risk Assessments
      • Drainage Strategies
      • Existing Drainage Assessments
      • Attenuation Specification and Sizing
      • Design of Flow Control Measures
      • Sustainable Drainage Systems SuDS
      • Drainage Modelling in Micro Drainage®
    • Transport
      • School Travel Assessments
      • Junction Analysis and Design
      • Access Appraisals
      • Traffic Calming and Safety Schemes
      • Sustainable Travel Assessments
      • Traffic Counts and Radar Speed Surveys
      • Parking Surveys and Assessments
      • Green Travel Plans
      • Swept Path Analysis (Vehicle Tracking)
    • Feasibility & Planning Support
      • Technical Investigations
      • Transport Statements and Assessments
      • Flood Risk Assessments
      • Drainage Strategies
      • Existing Services Investigations
  • Sectors
    • Residential
    • Commercial
    • Education
    • Public
  • Portfolio
  • Gallery
    • Transport
    • Flooding & Drainage
    • Civil Engineering Design
  • Careers
  • Contact
Stomor / Services  / Transport / Parking Surveys and Assessments

Services

  • Civil Engineering Design Services
    • Link Road and Estate Road Design (Section 38)
    • Section 278 Highway Design
    • Junction Analysis and Design
    • Adoptable Drainage Design (Section 104/106)
    • Private Drainage, External Works and Plot Setting Out
    • Site Clearance Plans
    • Construction Details
    • Existing Services Investigations
  • Flooding & Drainage
    • Flood Risk Assessments
    • Drainage Strategies
    • Existing Drainage Assessments
    • Attenuation Specification and Sizing
    • Design of Flow Control Measures
    • Sustainable Drainage Systems SuDS
    • Drainage Modelling in Micro Drainage®
    • LLFA compliant Drainage Strategies
  • Transport
    • School Travel Assessments
    • Junction Analysis and Design
    • Access Appraisals
    • Traffic Calming and Safety Schemes
    • Sustainable Travel Assessments
    • Traffic Counts and Radar Speed Surveys
    • Parking Surveys and Assessments
    • Green Travel Plans
    • Swept Path Analysis (Vehicle Tracking)
  • Feasibility & Planning Support
    • Technical Investigations
    • Transport Statements and Assessments
    • Flood Risk Assessments
    • Drainage Strategies
    • Existing Services Investigations

Parking Surveys and Assessments

We carry out surveys of existing parking demand and can include origin and destination surveys where neccessary. Results are supplied in report format or as a summary with recommendations for improvement or expansion where necessary.

For help with the next project, call us on…

01462 615433

or email, info@stomor.com

2018 © Stomor Ltd | Registered in England and Wales: 6460779
Registered Address: Suite 2, First Floor, Portmill House, Portmill Lane, Hitchin, Herts. SG5 1DJ
Website by Beacon Digital
  • Terms
  • Disclaimer
  • Accessibility
  • Contact